15358968703
Technical operation specification for finishing mill
2022-06-25
1. the finishing mill is the key part of the high-speed wire workshop. The technical requirements and process disciplines are obviously different from those of other units, and high vigilance shall be maintained at all times;...
Several subsidiaries of Shougang Group have been replaced!
2022-06-24
On June 21, the Party committee of Shougang Group held a cadre meeting of Shougang Shuigang and Shouqin company, and announced the decision of the Party committee of Shougang Group on the adjustment of the leadership members ...
Study on reducing coke ratio of blast furnace
2022-06-24
Abstract: the ladle, an important tool for storing, transporting, refining and casting molten steel in the steel plant, is introduced in detail, and the key points and difficulties in the use, turnover and operation of the la...
Study on reducing coke ratio of blast furnace
2022-06-24
Based on the analysis of the actual situation of the current national iron and steel industry, the development of non blast furnace ironmaking technology in China is slow (such as rotary hearth furnace), high energy consumpti...
Another "post-80s generation", chairman of steel enterprises!
2022-06-23
On June 21, the Party committee of Shougang Group held a cadre meeting of Shuigang to announce the decision on post adjustment of leaders. Shenyong, deputy secretary and deputy director of the Party committee of Guizhou SASAC...
grooveless rolling
2022-06-23
The method of rolling billets and bars on flat rolls without grooves is also called flat roll rolling, round edge rectangular rolling or grooveless rolling. Square billet, square steel and round steel are generally roll...